Schlumberger Regional Operations
Schlumberger
Location: Conway, ARSize: 20 acres
Tyler Group's Role: Boundary Survey, Topographic Survey, Water and Sewer Design, Drainage Design, Grading and Paving Design, Subdivision Plat, Construction Stake-Out, Construction Consulting
Engineer: Tyler Group
This site includes a 16,000 sq. ft. office, a 15,000 sq. ft. shop, and a warehouse. The complex houses a cement bulk plant used for cementing of oil and gas wells. Conway was selected as the site for this facility because of its proximity to oil and gas drilling and the critical resources Conway will provide Schlumberger, such as a good potential workforce and the local support structure needed for the business.